Veloce saves 160+ engineering hours every sprint

160+engineering hours saved per sprint
TravelIndustry
The challenge
Veloce’s digital team was stuck in a familiar loop: every landing page, content update and experiment needed an engineer. Marketing waited, engineering context-switched, and the backlog kept growing.
The solution
The team connected Nexora to their existing codebase and design system. Engineers registered their components once; marketers and designers began building pages visually, while Nexora Agent handled routine follow-ups as pull requests.
“Our developers love working with Nexora. Best vendor we have in support, process and documentation — by a distance.”
— Rohan Kapoor, Director of Engineering, Veloce
The results
- 160+ engineering hours saved per sprint
- Engineering refocused on core product work
- Every change still reviewed through pull requests
Want results like these? Book a demo.


